Handan Santai Rubber Industry Co., Ltd. - Comprehensive Emergency Response Exercise for Hazardous Ch
In order to train the company's emergency response personnel in emergency response capabilities, improve the company's emergency management organization's accident emergency response organization capabilities, and test the applicability of emergency plans, Handan Santai Rubber Industry Co., Ltd. organized a comprehensive emergency rescue drill for hazardous chemical spill accidents at 4:00 pm on June 9, 2022.
Scenario setting for accident occurrence
1. The measuring tank in the adhesive production workshop overflowed, and the operator slipped and had their eyes damaged by solvent during the emergency pump stop process. The pump stop operation was not carried out, resulting in a large amount of solvent leakage in the measuring tank.
02.jpg
2.Other operators in the position assist injured employees in escaping from the contaminated area and emergency flushing and disposal;
07.jpg
Discovery, reporting, and warning of accidents in the company's control room
1.The combustible gas alarm system set up in the central control room triggers an alarm. The duty officer checks and confirms the alarm information and reports it to the emergency office leadership
1查看报警信息.jpg
      2.Wang Lei from the emergency office confirmed the alarm information, arranged for the duty officer to contact the person in charge of the adhesive workshop, and organized on-site emergency rescue; And immediately report to the company's responsible person, follow the instructions of the company's responsible person, and issue company level accident emergency rescue warning information;
04.jpg
Carry out on-site emergency response
1.The person in charge of the adhesive workshop received the accident report and immediately organized emergency rescue personnel to rush to the scene and organize on-site emergency response.
7靳新军现场分组处置.JPG
2.Emergency personnel should wear air respirators and heavy-duty chemical protective clothing, enter the contaminated area caused by material spillage, drain the solvent to the empty mixing kettle, and eliminate the source of leakage.
8现场处置2.JPG
03.jpg
3.Emergency personnel wear gas masks and, under the command of the workshop manager, use a water gun to dilute the leaked solvent;
05.jpg
The leakage volume and area of hazardous chemical solvents are large, and the company level emergency rescue plan has been activated.
1.Each emergency rescue team of the company rushed to the scene to carry out emergency rescue according to the plan and the instructions of the overall commander;
抢险组赶赴现场01.jpg
2. The company's general manager and emergency commander-in-chief, Su Hai, led the personnel of the emergency command center to command rescue operations on site;
苏总现场指挥.JPG
3.The emergency rescue team used fire sand to block the entrance of the adhesive workshop, preventing the leakage of hazardous chemical solvents and expanding the accident;
06.jpg
      4.Organize rescue team members to wear air respirators and heavy chemical protective clothing and go deep into the contaminated area to further dilute and control hazardous chemical pollutants;
深入泄露区.JPG
5. The medical rescue team rescued the injured on site and promptly sent them to the hospital for further diagnosis and treatment
救护组.JPG
6、Collection and transfer of hazardous chemical spills
002.jpg
The drill was successfully concluded, and the observation and evaluation team and the general manager provided on-site feedback on the emergency rescue drill.
点评.JPG
0006.jpg